Parc de Saint-Léger

2024 10 23 Vyria Assets c Tof Studio Antoine BRODKOM @brod.kom 402
France Wind
Capacity MW
9.4
Type
Gamesa
Commissioning
2014

The Saint-Léger wind farm, commissioned in November 2014, operates 9.4 MW of Gamesa turbine capacity in a location with excellent wind resource potential. This Virya Energy (ex-Eurowatt) installation has delivered consistent performance for over a decade, demonstrating the long-term reliability of renewable energy infrastructure. The site’s geography provides favorable conditions for wind generation, with steady flow patterns that minimize operational variability. Gamesa turbines were selected for their proven durability and cost-effective maintenance profile, ensuring strong financial returns throughout the project’s operational life. Virya Energy’s ongoing engagement with the Saint-Léger community has maintained positive relationships, with the project serving as a model for sustainable energy development that benefits both local residents and regional energy security.