Parc de la Voie des Prêtres 2 Centre [Fontaine-les-Croisilles]

Wind turbines under cloudy sky
France Wind
Capacity MW
21.6
Type
Vestas
Commissioning
2023

The Voie des Prêtres 2 Centre wind farm in Fontaine-lès-Clercs, commissioned in May 2023, represents Virya Energy’s (ex-Eurowatt) latest investment in modern wind technology with 21.6 MW of Vestas capacity. This recent installation showcases the evolution of turbine technology, with significantly larger and more efficient units compared to earlier generations. The strategic positioning in the center of the Voie des Prêtres development corridor maximizes wind capture while facilitating grid integration. Vestas’ latest turbine models feature sophisticated blade designs and intelligent control systems that optimize energy production across diverse weather conditions. Virya Energy’s implementation of cutting-edge monitoring and predictive analytics ensures this installation operates at peak efficiency while minimizing downtime, setting new performance benchmarks for the company’s French portfolio.